First article inspection, done properly

July 2026 · 6 min read

A first article inspection is a simple promise with a formal wrapper: we made the first part off the real process, we measured everything the drawing asks for, and here is the evidence. Not a sample dimension here and there - everything. Every dimension, every note, every material call-out, verified on a part made the way production parts will be made.

The aerospace standard AS9102 gives the promise its best-known shape, but the need is universal. If you machine, mould, fabricate or assemble drawing-controlled parts for anyone, a first article - under that name or another - is how a new part, a new tool or a moved process earns the right to run. In the AIAG world it slots into PPAP as the dimensional-results element; the discipline is identical.

Three forms, three questions

AS9102 splits the evidence into three forms, and the split survives because each answers a different question:

Number the characteristics on a copy of the drawing itself - ballooning, in the jargon - so anyone can trace row 14 of Form 3 to the exact dimension it reports. An FAI without a ballooned drawing is a list of numbers with no address.

The asymmetric tolerance trap

Here is where home-grown FAI sheets quietly fail. Real drawings do not deal only in ±. They say 8.0 +0.1/-0, because the hole may be a shade big but never small. They say 25.4 +0/-0.2. A measurement grid with a single "tolerance" column cannot represent these - so someone converts 8.0 +0.1/-0 into "8.05 ± 0.05" (and everyone downstream misreads the nominal), or worse, types ±0.1 and accepts parts at 7.95 that the drawing forbids.

A first article sheet needs three tolerance inputs - nominal, plus, minus - and a pass/fail that evaluates them separately. 8.0 measured at 7.98 with a +0.1/-0 tolerance is a FAIL, and the spreadsheet has to know it.

And the verdict logic must roll up without mercy: one failed characteristic makes the whole FAI a fail, and that overall disposition should flow to the cover form by formula, not by hope. A FAIL is not a disaster - it is a finding. Raise the NCR, reference it on the failed row, fix the process, and re-verify the failed characteristics. An FAI file that shows a caught failure, properly dispositioned, is more convincing to an auditor than a suspiciously perfect one.

When you have to do it again

An FAI certifies a snapshot: this part, this drawing revision, this process, this location. Change any of them and the certificate ages accordingly. A drawing revision, a new or reworked tool, a process moved to a different machine or site, a new special-process supplier, or a long production gap (AS9102 uses two years) all trigger a new FAI - but usually a partial one, covering only the characteristics the change could affect. Form 1 asks whether the FAI is full or partial and why; a well-reasoned partial FAI is standard practice, not a shortcut. What matters is that the reasoning is written down: which characteristics, why those, why not the rest.

One last habit: record the gauge ID against every measured row. It costs seconds during the inspection, and it is the difference between a shrug and an answer when a calibration failure later asks what that instrument touched.

The FAI that understands 8.0 +0.1/-0

The AS9102-style three-form structure in plain Excel: separate plus and minus tolerances, automatic per-characteristic pass/fail, an overall verdict that flows to the cover form, and a worked welded-bracket example with one deliberate FAIL dispositioned to an NCR.

Get the FAI Template on Etsy

Never miss a guide

New articles and templates, straight to your inbox. Plus a free tool to start.

By subscribing you consent to receive emails from Axiom. Your address is stored with Kit, our email provider, and never shared. Unsubscribe any time via the link in every email. Privacy policy.